    ENERGY


    2011-2012: Environmental Impact Assessment of Flue-gas Desulphurization Plant in 1650 MW Lignite-Fired Thermal Powerplant “Nikola Tesla A”
    Keywords: EIA, flue-gas desulphurization, thermal power plant
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade. Project financed by Japan official development assistance (ODA Loan).
    Client (beneficiary): TPP “Nikola Tesla”;
    Authority: Ministry of Environment, Mining and Spatial Planning of Serbia;

    2011: Environmental Impact Assessment of Use of Refuse Derived Fuel (RDF) as a Fuel in “Titan” Cement Plant, Kosjeric, Serbia
    Keywords: EIA, refuse derived fuel, cement plant
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade;
    Client: “Titan” cement plant;
    Authority: Ministry of Environment, Mining and Spatial Planning of Serbia;

    2010: Environmental Impact Assessment of Incineration of Seized Tobacco and Drugs in TPP “Nikola Tesla A”, Obrenovac, Serbia
    Keywords: EIA, tobacco and drugs incineration, thermal power plant
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade;
    Client: TPP “Nikola Tesla”;
    Authority: Ministry of Environment, Mining and Spatial Planning of Serbia;

    2010: Environmental Impact Assessment of Coal Quality Analyser in TPP “Nikola Tesla B”, Obrenovac, Serbia
    Keywords: EIA, coal quality analyzer, thermal power plant
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade;
    Client: TPP “Nikola Tesla”;
    Authority: Ministry of Environment, Mining and Spatial Planning of Serbia;

    2008-2009: Environmental Impact Assessment of 116 MW Hot-Water Boiler in District Heating Plant “Vozdovac”, Belgrade, Serbia
    Keywords: EIA, district heating, hot-water boiler
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade;
    Client: PUC “Beogradske Elektrane” – District Heating Company;
    Authority: Secretariat for Environmental Protection of the City of Belgrade;

    2008-2009 Environmental Impact Assessment of 140 MW hot-water boiler in district heating plant “Novi Beograd”, Belgrade, Serbia
    Keywords: EIA, district heating, hot-water boiler
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade;
    Client: PUC “Beogradske Elektrane” – District Heating Company;
    Authority: Secretariat for Environmental Protection of the City of Belgrade;

    2008-2009: Environmental Impact Assessment of Flue-Gas Desulfurization Plant in TPP “Kostolac B”, Serbia
    Keywords: EIA, flue-gas desulphurization, thermal power plant
    Project performed in the team of the Faculty for Mechanical Engineering, University of Belgrade (Serbia) in consortium with Faculty of Mining and Geology (Belgrade, Serbia), Worley Parsons (USA), Energoprojekt Entel (Belgrade, Serbia)
    Client: TPP „Kostolac“;
    Authority: Ministry for Spatial Planning and Environmental protection, Republic of Serbia;

    2006: Environmental Assessment of proposed 700 MW lignite-fired thermal power plant “Kolubara B”
    Keywords: thermal power plant, environmental assessment
    Project area: Municipality of Lazarevac (Central Serbia);
    Project scope: As a part of the project realized by Epic (Austria), related to improvement of investment activities, selection and attraction of the strategic partner for TPP Kolubara B construction completion, InSitu was responsible for environmental assessment of the proposed TPP.
    Client: EPIC (Austria) / Electric Power Industry of Serbia (EPS);

  • +

    WIND


    2015: Cumulative Impact Assessment of 99 MW wind farm “Alibunar A”, Serbia
    Keywords: windfarm, cumulative impact, ESIA
    Project area: Municipality of Alibunar (North Serbia, Province of Vojvodina)
    Project Scope: Following the completion of the ESIA due diligence by the lenders, the preparation of Cumulative Impact Assessment was one of the needed actions. InSitu was subcontracted for this task by Atkins (UK).
    Client: WindVision Operations (Serbia).

    2013-2014: Environmental and Social Impact Assessment of 125 MW wind farm “Kovacica”, Serbia
    Keywords: windfarm, ESIA
    Project area:Municipality of Kovacica (North Serbia, Province of Vojvodina)
    Project Scope: Preparation of environmental and social impact assessment (ESIA) in accordance with IFI’s performance standards and local Serbian regulation. InSitu was a local consultant supporting the leading WSP (UK). EIA process successfully completed including the screening, scoping and public consultation procedures. Consent obtained in March 2014.
    Client: Electrawinds (Serbia);
    Authority: Provincial Secretary of Environment, Novi Sad.

    2011-2012: Environmental and Social Impact Assessment of 157 MW windfarm “Cibuk”, Serbia
    Keywords: windfarm, ESIA
    Project area:Municipality of Kovin (North Serbia, Province of Vojvodina)
    Project Scope: Preparation of environmental and social impact assessment (ESIA) in accordance with IFI’s performance standards and local Serbian regulation. InSitu was a local consultant supporting the leading WS Atkins (UK). EIA process successfully completed including the screening, scoping and public consultation procedures. Consent obtained in November 2012.
    Client: Continental Wind Partners (Serbia);
    Authority: Provincial Secretary of Environment, Novi Sad.

  • +

    BIOMASS


    2014: Feasibility Study – Sabac district heating upgrade, Serbia;
    Keywords: biomass, district heating, enviornmental and social due dilligence, EBRD, feasibility study
    Project area: City of Sabac (North-East Serbia)
    Project scope: Installation of new biomass boiler and improvement of the heating network. Realized by Fichtner (Germany) and Energy Saving Group (Serbia). InSitu was subcontracted.
    Our Task: Environmental and Social Due Diligence of the district heating company; Environmental and Social Analysis of the project; Environmental and Social Action Plan; Evaluation of compliance with the EBRD performance requirements; Stakeholder Engagement Plan.
    Project financed by European Bank for Reconstruction and Development;
    Project beneficiary: City of Sabac, District Heating Company „Toplana Sabac“.

    2012: Promotion of Renewable Energy Sources and Energy Efficiency (EuropeAid/129768/C/SER/RS) – Component B;
    Keywords: biomass, environmental and social analysis, pre-feasibility study
    Project area: Krusevac (Central Serbia), Pancevo, Ruma (north Serbia, Province of Vojvodina)
    Project scope: Build the capacity in the energy sector which will lead to the increased use of geothermal energy and increased participation of high efficient CHP facilities in electricity generation and heat production. The project was performed by EPTISA (Spain) in association with Mannvit (Iceland) and Energy Saving Group (Serbia).After initial screening, three sites were selected for development of CHP facilities with improved energy efficiency. Three pre-feasibility studies were produced.
    Our task: For the purpose of the pre-feasibility studies InSitu performed the environmental and social assessment of the project
    Project financed by the European Union Delegation to Serbia under the IPA2008 Programme.
    Beneficiary: Ministry of Infrastructure and Energy.

  • +

    HYDROPOWER


    2013: Environmental and Social Impact Assessment of 2.4 MW small hydropower plant “Moravica”, Arilje, Serbia
    Keywords: small hydropower plant, ESIA
    Project area: Municipality of Arilje, River Moravica (Western Serbia);
    Project scope/Our task: Environmental and Social Impact Assessment according to IFC performance standards. Project included investigations at the Moravica River, collection and detailed review of baseline environmental data, preparation of the ESIA Report including Environmental and Social Action Plan, Stakeholder Engagement Plan;
    Client: Enso Hydro (Austria) / Energy Saving Group (Serbia).

    2011: Environmental and Social Due Diligence of “Selova” and “Rovni” small hydro-power plants
    Keywords: small hydropower plants, due dilligence, EBRD
    Project area: Selova dam (Kursumlija, south Serbia) and Rovni dam (Valjevo, west Serbia);
    Project scope: Electric Power Industry of Serbia (EPS) has approached EBRD for financing of construction of two small hydro-power plants at “Selova” and “Rovni” dams. The Bank engaged WS Atkins (UK) as a lead Consultant to undertake environmental and social due diligence of the project in accordance with EBRD performance requirements;
    Our task: InSitu was involved as a local environmental and social consultant. Our tasks included local legislation expertise, baseline assessment, gap analysis, stakeholder engagement plan.
    Client: European Bank for Reconstruction and Development.

    2008-2009: Renewable energy feasibility studies (EuropeAid/126034/D/SER/YU)
    Keywords: small hydropower plants, feasibility study, environmental analysis
    Project scope: Project financed by EUD performed by consortium Eptisa/Socoin/NIP included preparation of Feasibility Study for 38 sites in Serbia predicted for installation of small hydropower plants;
    Our Task: As local experts in the project team we were responsible for environmental legislation review, environmental screening, baseline environmental assessment at the HPP sites, identification of significant environmental impacts in relation to HPP construction and operations, proposing the environmental mitigation measures, monitoring;
    Project funded by the European Union Delegation in Serbia;
    Beneficiary: Ministry of Energy and Mining of Serbia.

  • +

    GEOTHERMAL


    2012: Promotion of Renewable Energy Sources and Energy Efficiency (EuropeAid/129768/C/SER/RS) – Component A;
    Keywords: geothermal energy sources, environmental and social analysis, pre-feasibility study
    Project area: Mataruska Banja (Central Serbia), Bogatic (West Serbia), Vrbas (North Serbia, Province of Vojvodina)
    Project scope: Build the capacity in the energy sector which will lead to the increased use of geothermal energy and increased participation of high efficient CHP facilities in electricity generation and heat production. The project was performed by EPTISA (Spain) in association with Mannvit (Iceland) and Energy Saving Group (Serbia).
    After initial screening three sites with the greatest geothermal potential were selected for preparation of pre-feasibility studies;
    Our task: For the purpose of pre-feasibility studies InSitu performed the environmental and social assessment of the project;
    Project financed by the European Union Delegation to Serbia under the IPA2008 Programme;
    Beneficiary: Ministry of Infrastructure and Energy.

  • +

    WASTEWATER AND SANITATION


    2015-2016: Wastewater collection and Treatment Project for the City of Niš (Serbia) – Feasibility Study;
    Keywords: sanitary and industrial wastewater, environmental and social analysis, feasibility study;
    Project area: City of Niš;
    Our task: environmental and social analysis of the proposed wastewater collection and treatment (250,000 PE);
    The Study has been prepared by IMG on behalf of the Swedish International Development Cooperation Agency (SIDA) as part of the Environmental Infrastructure Support Programme (EISP), implemented by the International Management Group (IMG).
    Beneficiaries: Ministry of Agriculture and Environmental Protection, City of Niš.

    2014: Pomoravlje improvement of water and wastewater management – Feasibility Study;
    Keywords: water supply, communal and industrial wastewater, environmental and social analysis, feasibility study;
    Project area: Municipalities of Paracin, Cuprija, Despotovac, Svilajnac, Rekovac (Central Serbia);
    Our task: environmental and social analysis;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2014: The City of Zrenjanin Waste Water Management Project – Feasibility Study;
    Keywords: wastewater treatment plant, environmental and social analysis, feasibility study
    Project area: City of Zrenjanin, Serbia (Vojvodina Province)
    Project scope: Construction of wastewater treatment plant for industrial and communal wastewater of the city of Zrenjanin (~100,000 PE). Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2010 Programme.

    2013: Protection of Lake Bovan Catchment Area – Feasibility Study;
    Keywords: wastewater and sanitation, environmental and social analysis, feasibility study, tourism development
    Project area: Town of Sokobanja, East Serbia
    The project scope: Integrated development and improvement of water supply and wastewater collection/sewerage systems and the construction of a wastewater treatment plant (16,000 PE) in the city of Sokobanja. Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2010 Programme.

    2013: Cacak Wastewater Treatment Plant – Feasibility Study;
    Keywords: wastewater collection and treatment, communal and industrial wastewater, environmental and social analysis, feasibility study
    Project area: City of Cacak, Central Serbia
    Project scope: Improvement of wastewater collection and installation of the wastewater treatment plant (96,000 PE) in the city of Cacak. Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Environmental and social analysis;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2011 – 2012: Raska Water Management – Feasibility Study;
    Keywords: wastewater collection and treatment, communal wastewater, tourism development, environmental and social analysis, feasibility study
    Project area: Municipality of Raska, National Park Kopaonik (South Serbia)
    Project scope: Replacement of the pressure main, extension and rehabilitation of sewer network, construction of the main collector, construction of the wastewater treatment plant (WWTP ~15-18,000 PE) in the municipality of Raska including the touristic center Kopaonik. Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Environmental and social analysis
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2010: Wastewater Treatment Plant in Novi Pazar – Feasibility Study;
    Keywords: wastewater collection and treatment, communal and industrial wastewater, environmental and social analysis, feasibility study
    Project area: Municipality of Novi Pazar (South Serbia)
    The project scope: Rehabilitation and extension of the sanitary and storm sewerage, construction of the main wastewater collector, and construction of the 120,000 PE wastewater treatment plant and sludge treatment installation for the town of Novi Pazar. Feasibility study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Environmental and social analysis
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2010: Technical Assistance for Preparation of Investment Project for Wastewater Collection and Treatment in Prilep; (EuropeAid/127241/C/SER/MK performed by Eptisa in association with CES)
    Keywords: ESIA review, communal wastewater and sanitation, preparation of tender dossiers
    Project area: City of Prilep (FYR of Macedonia)
    The project scope: To assist the Ministry of Environment and Physical Planning, the Central Finance and Contracts Department in the Ministry of Finance as well as the JKP Vodovod i kanalizacija Prilep in preparation of the design and tender documents for the sewerage network rehabilitation and extension and the construction of Wastewater Treatment Plant (95,000 PE) on a greenfield site for the city of Prilep.
    Our task: Review of the existing ESIA, preparation of the supplement documents in order to fulfill IFI’s environmental standards, provision of environmental requirements for tender dossiers.
    Project funded by the European Union Delegation to the FYROM.

  • +

    WATER SUPPLY


    2011: Regional Water Supply Scheme Morava;
    Keywords: groundwater resources overview, groundwater well design, preparation of tender dossiers, sanitary protection of local groundwater resources
    Project area: Municipalities of Velika Plana and Smederevska Palanka (Central Serbia)
    The project scope: Improvement of drinking water supply through rehabilitation and extension of existing groundwater sources in Smederevska Palanka and Trnovce, completion of water transmission system, construction of regional water treatment plant Trnovce. Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Detailed overview and analysis of groundwater resources, design of new wells, design of rehabilitation of the existing wells, preparation of tender dossiers.
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2010 Programme.

    2010-2011: Environmental Action Plan for Celije reservoir;
    Keywords: environmental action plan, lake-reservoir, regional source, water supply
    Project area: Reservoir Celije near the city of Krusevac (central Serbia)
    Project scope: Reservoir Celije is a water source of the regional water supply system „Rasina“ serving 250,000 people in the town of Krusevac and the municipalities of Aleksandrovac, Ćićevac, Varvarin, Trstenik, Paraćin and Ćuprija. As a part of improvement of the regional water supply system, funded by EU, the Enviromental Action Plan for the Celije lake was prepared. The Action plan provided the set of institutional and operational measures to prevent further degradation of the reservoir water quality. Project was prepared as a part of the MISP program (Municipal Infrastructure Support Programme) performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: preparation of the Action Plan.
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2008-2009 : Kolubara Regional Water Supply Scheme – Feasibility Study;
    Keywords: regional water supply, groundwater resources overview, environmental and social analysis
    Project area: Kolubara region – Municipalities of Valjevo, Lazarevac, Mionica, Ub, Lajkovac (West Serbia)
    The project scope: Improvement of regional water supply scheme including installation of raw water system from the accumulation Rovni, construction of several drinking water treatment plants, installation of transmission system. Feasibility study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Overview and analysis of groundwater resources in the region and preparation of the environmental and social analysis of the project.
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2008-2009: South – West Backa – Regional Water Supply – Feasibility Study;
    Keywords: regional water supply, preliminary hydrogeological investigations, groundwater resources overview, environmental and social analysis
    Project area: Region of West Backa, municipalities of Backa Palanka, Bac, Odzaci and Kula (Serbia, Province of Vojvodina)
    The project scope: Construction of regional water supply scheme including opening of new groundwater sources (well fields) in the Danube River alluvial formations. Feasibility study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Detailed analysis of the existing sources, preliminary investigations of the potential new sources along the Danube River, environmental assessment of the proposed project.
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2008-2009: Pcinja District – Intermunicipal Water Supply Project – Feasibility Study;
    Keywords: regional water supply, environmental and social analysis, groundwater resources overview
    Project area: Pcinja District – Municipalities of Vranje, Bujanovac and Presevo (South Serbia)
    Project scope: Development of regional water supply scheme using raw water from Prvonek water reservoir near Vranje. Project included installation of raw water transmission line, construction of several drinking water treatment plants, improvement of the existing systems in municipalities. Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Overview and analysis of groundwater resources in the region and preparation of the environmental and social analysis of the project.
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

  • +

    WASTE


    2016-2017: Feasibility Study, design and tender documentation of an integrated waste management system in East and Northeast Region of FYR Macedonia (EuropeAid/136070/IH/SER/MK).
    Keywords: waste management, feasibility study;
    Project scope: Preparation of the project studies (FS, CBA, EIA), design and tender documentation for the project. Performed by the consortium Eptisa (Spain), Epem (Greece).
    Our task: Environmental and Social Analysis as part of Feasibility Study, Environmental and Social Impact Assessment compliant to the EU Directive, Environmental Impact Assessment compliant to the national legislation.

    2015-2016: Environmental and Social Scoping Study for Belgrade Waste to Energy Project, Serbia;
    Keywords: Vinca waste landfill, closure of waste dumpsites, environmental and social scoping
    Project area: City of Belgrade;
    Project scope: Part of technical advisory services of the IFC to the City of Belgrade in developing of public-private-partnership through the international tender. The Scoping Study includes development and construction of new waste treatment and disposal facilities, including construction of a new sanitary landfill for residual non-hazardous and inert waste, and rehabilitation of the existing landfill. InSitu was part of the team led by Fichtner (Germany);
    Our task: Environmental Scoping Study;
    Client: International Finance Corporation.

    2013: Zrenjanin Regional Waste Management System – Feasibility Study;
    Keywords: regional waste landfill, closure of waste dumpsites, environmental and social analysis, feasibility study
    Project area: Municipalities of Zrenjanin, Titel, Kovacica, Secanj, Zitiste (north-east of Serbia, Province of Vojvodina)
    Project scope: Development of the regional waste management scheme in five municipalities (approx. 200,000 inhabitants) including construction of the regional landfill centre and closure of the existing dump sites. Feasibility study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Groundwater pollution analysis at the landfill site, environmental and social impact analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2010 Programme.

    2011 – 2012: Regional solid waste management scheme at Pirot District – Preparation of Master Plan for closure of the existing landfills;
    Keywords: field investigations, risk assessment, closure plan
    Project area: Municipalities of Pirot, Dimitrovgrad, Babusnica, Bela Palanka (South-East Serbia);
    Project scope: Closure of the existing municipal dumpsites in four municipalities. Based on the risk assessment and results of performed investigation the cost-efficient measures for landfill closure were proposed. Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental baseline analysis, preparation of risk assessment, management of field investigation and evaluation of results, proposal of the closure plan;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2011: Waste management plan for Vrbas wastewater treatment plant;
    Keywords: waste management plan during construction and operation of the WWTP
    Project area: Municipality of Vrbas and Kula (Serbia, Province of Vojvodina);
    Project scope: Construction of wastewater treatment plant (120,000 PE) in the town of Vrbas, extension of sewerage collection system, construction of main sewers connecting the towns of Kula and Crvenka to the WWTP in Vrbas. Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Preparation of Waste Management Plan followed by Environmental Monitoring Plan and Health and Safety Management Plan for construction and operation of the proposed wastewater treatment plant in Vrbas. Plans were required in order to satisfy the IFI’s environmental standards, as an amendment to the existing (locally prepared) EIA;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2009: Preparation of the Regulation on handling PCB-containing equipment and waste;
    Keywords: legislation, PCB handling and disposal, PCB waste management;
    Client: Ministry of Environment and Spatial Planning of the Republic of Serbia;
    Project scope/our task: As a part of the Project funded by the UNEP/GEF Project assisting the Ministry of Environment and Spatial Planning in preparing the National Implementation Plan (NIP) for the implementation of the Stockholm Convention on POPs, InSitu experts were involved as consultants in preparation of the PCB Regulation and accompanying documents. The Regulation was enacted in 2011.

  • +

    SOIL AND GROUNDWATER


    2012: Field Investigation for the purpose of Master Plan for closure of the existing landfills in the Pirot region;
    Keywords: field investigations, environmental media sampling and analysis
    Project area: Municipalities of Pirot, Dimitrovgrad, Babusnica, Bela Palanka (South-East Serbia)
    Project scope: Preparation of the Master Plan for closure of the existing landfills in four municipalities;
    Our task: Management of investigation works on dumpsites including installation of monitoring wells, soil and groundwater sampling and analysis, surface water and river sediment sampling and analysis, topographic measurements.
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2010 – 2011: Design and Installation of Groundwater Monitoring Network in “Holcim” Cement Plant, Novi Popovac, Serbia;
    Keywords: monitoring wells network, groundwater sampling and analysis
    Project scope: InSitu was commissioned by Holcim to establish the groundwater monitoring at the cement plant site in Novi Popovac and at the adjacent abandoned industrial landfill. The scope of work included installation of 14 monitoring wells at the plant site, sampling and analysis of 30 wells, evaluation of the results, preparation of conceptual hydrogeological model, etc.
    Client/ Project site: Holcim Cement Plant, Novi Popovac (Serbia)

  • +

    INFRASTRUCTURE


    2014: Municipality of Apatin Industrial Zone – Feasibility Study;
    Keywords: infrastructure, logistic center, environmental and social analysis, feasibility study;
    Project area: Municipality of Apatin;
    Project scope: Development of the logistic zone;
    Our task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2010 Programme.

    2013: Free Zone South Logistics Center Nis – Feasibility Study;
    Keywords: infrastructure, logistic center, environmental and social analysis, feasibility study Project area: The City of Nis (South Serbia);
    Project scope: Development of the logistic zone (for efficient truck transport of goods) in the outskirts of the city of Nis, in order to extend the activities of the current industrial zone. Project scope included development of site infrastructure (access roads, water and sanitation, electricity, telecommunication, drainage, parking lots, office space). Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2010 Programme.

    2012: Pirot Logistics center – Feasibility Study;
    Keywords: infrastructure, logistic center, environmental and social analysis, feasibility study;
    Project area: Municipality of Pirot (South-East Serbia);
    Project scope: Development of intermodal logistic center (for efficient truck and railway transport of goods) in the town of Pirot, in order to extend the activities of the current industrial zone. Project scope included development of site infrastructure (access roads, water and sanitation, electricity, telecommunication, drainage, parking lots, office space). Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our Task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2011: Vladicin Han Regional Industrial Zone South – Feasibility Study;
    Keywords: infrastructure, industrial zone, environmental and social analysis, feasibility study;
    Project area: Town of Vladicin Han (South-East Serbia);
    Project scope: Infrastructure development (roads, sewage, water supply, electricity, communications) for the future industrial zone “South” in the town of Vladicin Han. Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our Task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

  • +

    TRANSPORT


    2017: Environmental and social due diligence audit of two road sections of Trans-European Corridor Vc: the Johovac – Rudanka section (6 km) and the Johovac – Podnovlje (14 km) in Republika Srpska, Bosnia and Herzegovina;
    Keywords: motorway, environmental and social due diligence audit
    Project Scope: Environmental and social due diligence audit of the project. InSitu was subcontracted as a local consultant by Zylwood Consulting (UK).
    Our task: Local support in environmental and social due diligence work;
    Client: European Bank for Reconstruction and Development, European Investment Bank.

    2015-2016: Reconstruction and modernization of the existing railway track and construction of a second track on the line Belgrade – Niš, Section Stalac – Djunis (Serbia); Infrastructure Projects Facility in the Western Balkans; WB8-SER-TRA-14; EuropeAid/131160/C/SER/MULTI/3C – funded by European Commision Delegation;
    Keywords: railway, feasibility study, environmental and social impact assessment
    Project Scope: Feasibility Study of modernization of the 17 km-long railway line. Project performed by the consortium led by Mott MacDonald (UK). InSitu was part of the team lead by Atkins (UK).
    Our task: (1) Environmental and Social Impact Assessment of the project according to the EBRD Performance Requirements, (2) Environmental Impact Assessment according to the national requirements;
    Beneficiary: PE „Serbian Railways“

    2015: Environmental and social due diligence audit of two key road sections of Trans-European Corridor Vc: the Pocitelj – Buna section (7 km) and the Donja Gracanica – Zenica North (2 km), Bosnia and Herzegovina;
    Keywords: motorway, environmental and social due diligence audit
    Project Scope: Environmental and social due diligence audit of the project. InSitu was subcontracted by Atkins (UK).
    Our task: Environmental Due Diligence of current operations, preparation of Environmental and Social Action Plan, and evaluation of the project’ compliance with the EBRD performance requirements;
    Client: European Bank for Reconstruction and Development

    2009-2010: Modernisation of the railway line Trupale (Nis)-Presevo-border of the Former Yugoslav Republic of Macedonia; Infrastructure Projects Facility in the Western Balkans; TA-SER-15; EuropeAid/124605/C/SERMULTI – funded by European Commision Delegation;
    Keywords: railway, pre-feasibility study, environmental and social analysis
    Project Scope: Pre-Feasibility Study of modernization of the 167 km-long railway line. Project performed by the consortium led by WYG International (UK). InSitu was part of the team lead by Faculty of Transport and Traffic Engineering University of Belgrade
    Our task: (1) Evaluation of environmental and socio-economic effects of each project option; (2) Effects of Modernization and Environmental and Social Impact Analysis;
    Beneficiary: PE „Serbian Railways“

    2007-2008: Feasibility Study of road “Novi Sad-Sabac-Loznica-Pozega”; Europe Aid/117702/D/SV/YU; performed by consortium Eptisa Group and IRD.
    Keywords: road, feasibility study, environmental and social impact assessment
    Project Scope: Rehabilitation of the road M21 from Novi Sad to Pozega via Sabac (North and West Serbia).
    Our task: environmental and social impact assessment
    Beneficiary: PE „Roads of Serbia“
    Project funded by European Agency for Reconstruction.

  • +

    INDUSTRY


    2017: Phase I Environmental Health and Safety Due Diligence Audit of metal rollers production site, Federation of Bosnia and Herzegovina (BiH)
    Project scope/our task: EHSDD for buy-side. InSitu was subcontracted by Enacon (Czech Republic) to perform the audit;
    Project area: northern Herzegovina;
    Client: ERM (Germany).

    2017: Desktop Environmental Health and Safety Assessment of float glass production, Croatia
    Project scope/our task: Assessment for sell-side. InSitu was subcontracted by Enacon (Czech Republic) to perform the audit;
    Project area: western Slavonia;
    Client: ERM (UK).

    2015-17: Environmental Assessment and Health and Safety Audit of Magna Seating d.o.o., Odzaci, Serbia
    Project scope/our task: Regular annual environmental assessment and HS audit of factory for manufacturing of covers for cars and vehicles. InSitu was subcontracted by Ramboll Environ (Germany) to perform the audit;
    Project area: Town of Odzaci (north-west Serbia, Province of Vojvodina);
    Client: Magna Europe (global automotive supplier).

    2014: Phase I Environmental Site Assessment and Compliance Audit of Magna Seating d.o.o., Odzaci, Serbia
    Project scope/our task: Phase I ESA and compliance audit of factory for manufacturing of covers for cars and vehicles. InSitu was subcontracted by Environ (Germany) to perform the audit.
    Project area: Town of Odzaci (north-west Serbia, Province of Vojvodina)
    Client: Magna Europe (global automotive supplier).

    2012: Environmental Due Diligence of “Rudnik Kovin” mine, Serbia
    Project scope/our task: The Client was considering the opportunity for acquisition of the (underwater river) coal mine and was evaluating the risks of the potential investment. InSitu performed limited environmental due diligence in order to evaluate the site’ environmental legal compliance.
    Project site: Kovin Mine (north Serbia, Province of Vojvodina)
    Client: confidential;

    2012: 400 kV Overhead Power Line Connecting the Wind Farm Cibuk to the National Grid – EIA Scoping
    Keywords: overhead power line, EIA scoping
    Project area: Municipality of Kovin, Province of Vojvodina (north Serbia)
    Project scope: Preparation of the scoping report as a part of the formal EIA procedure for the proposed 10,7 km-long 400 kV OHL.
    Client: Continental Wind Partners (Serbia);
    Authority: Provincial Secretary of Environment, Novi Sad.

    2010: Environmental Audit of “Lafarge” Cement Plant and Associated Quarries in Beocin, Serbia
    Project scope/our task: The cement producer Lafarge commissioned Atkins (UK) to conduct the global internal environmental audit following the Lafarge audit protocol. InSitu was subcontracted by Atkins to support the audit of the site in Serbia.
    Project site: Beocin cement plant (north Serbia, Province of Vojvodina)
    Client: Lafarge ETC.

    2010: Phase I Environmental Assessment of Heavy Vehicle Repair and Maintenance Site in Sarajevo, Bosnia and Herzegovina;
    Project scope/our task: InSitu was commissioned by a global automotive manufacturer to perform the Phase I ESA of the site in Sarajevo considered for acquisition.
    Project site: Sarajevo (Bosnia and Herzegovina)
    Client: Confidential.

    2010: Environmental Audit of TPP “Kolubara A”, TPP “Kostolac B” and Lignite Open Mine “Tamnava West”, Serbia;
    Project scope/our task: EBRD provided the loan to Electric Power Industry of Serbia (EPS) for three projects in Serbia. Following the EBRD project monitoring procedure, the Bank commissioned Environ (UK) to conduct the audit of implementation of actions specified in the Environmental Action Plans and loan agreement documentation. InSitu was subcontracted by Environ as a local consultant.
    Project sites: Central Serbia
    Client: EBRD.

    2009: Phase I Environmental Assessment of a Heavy Vehicle Repair and Maintenance Site, Belgrade, Serbia;
    Project scope/our task: InSitu was commissioned by a global automotive manufacturer to perform the Phase I ESA of the site in Belgrade considered for acquisition.
    Project site: Belgrade (Serbia)
    Client: Confidential.

    2008-2009: Environmental Impact Assessment of Offset Printing Plant, Belgrade
    Keywords: EIA, offset printing
    Project area: City of Belgrade (Serbia)
    Project Scope: InSitu was commissioned by the Client as a consultant to undertake the full EIA process (including screening, scoping, EIA, public consultation) for the project of re-development of the offset printing plant. Consent obtained in October 2009.
    Clients: “Politika”, “Politika Newspapers and Magazines”;
    Authority: Secretariat for environmental protection of the City of Belgrade

    2007-2009: Environmental Impact Assessment of Water Bottling Plant, Mionica, Serbia
    Keywords: EIA, water bottling industry, natural mineral water
    Project area: village Kljuc (Mionica, central Serbia)
    Project Scope: InSitu was commissioned by the Client as a consultant to undertake the full EIA process (including screening, scoping, EIA, public consultation) for the project of development of the water bottling plant. Consent obtained in January 2009.
    Client: “Mioni” d.o.o., Belgrade;
    Authority: Municipality of Mionica

    2008: Phase I Environmental Assessment of Three Sites of Carbon-Steel Product Manufacturing and Retail, Serbia;
    Project scope/our task: InSitu was commissioned by a global steel manufacturer to perform the Phase I ESA of three sites (production and retail) in Belgrade, considered for acquisition.
    Project site: Belgrade (Serbia)
    Client confidential.

    2008: Phase I Environmental Assessment of Coatings Manufacturing Plants in Serbia and FYR of Macedonia;
    Project scope/our task: A global paints and coatings manufacturer commissioned Environ (Poland) to conduct the Phase I ESA (including health and safety) of paints manufacturing sites in Serbia and Macedonia considered for acquisition. InSitu was subcontracted by Environ to perform the assessment.
    Project site: Sabac (Serbia) and Skopje (FYR of Macedonia)
    Client confidential.

    2007-2008 : Environmental Impact Assessment of Poultry Farm, Serbia;
    Keywords: EIA, poultry farming
    Project area: Municipality of Surcin (Belgrade)
    Project Scope: InSitu was commissioned by the Client as a consultant to undertake the full EIA process (including screening, scoping, EIA, public consultation) for the project of development of the poultry farm. Consent obtained in September 2007.
    Client: “PiljanKomerc”, Boljevci;
    Authority: Municipality of Surcin

    2007: Environmental Due Diligence of Major Agricultural Manufacturer in Serbia;
    Project scope/our task: Raiffeisen Investment AG was selected as a privatization advisor of the Agency of Privatisation of Republic of Serbia in the project of privatization of PKB Corporation – the largest agricultural company in Serbia. InSitu was commissioned by Raiffeisen to perform the environmental and health and safety due diligence of the company in accordance with the World Bank standards (who funded the privatization process). PKB production involves cattle breeding, farming and dairy production.
    Project site: Belgrade (Serbia);
    Client: Agency of Privatisation of Republic of Serbia.

    2007: Regional oil products pipeline through Serbia – Pre-feasibility study;
    Keywords: regional oil product pipeline, preliminary EIA
    Pipeline route: Sombor-Novi Sad-Pancevo-Smederevo-Jagodina-Nis
    Project scope: Preparation of the pre-feasibility study and general design of the proposed regional oil products pipeline (402 km) through Serbia.
    Our task: Preliminary environmental impact analysis of the project
    InSitu was subcontracted by “Energoprojekt Industrija”, Belgrade;
    Client: “Transnafta”, Pancevo.

  • +

    REAL ESTATE & GREENFIELDS


    2012: Environmental Site Assessment and Limited Groundwater Investigation at the Site in Nis, Serbia
    Project scope/our task: InSitu was commissioned by a global automotive manufacturer to perform the environmental assessment of the site in Nis considered for acquisition. Service included Phase I ESA and installation of monitoring well, groundwater sampling and analysis in order to evaluate potential historical contamination.
    Project site: Nis (south Serbia)
    Client: Confidential.

    2010: Phase I Environmental Assessment and Limited Phase II Assessment at the Greenfield Site in Belgrade, Serbia;
    Project scope/our task: The Client (global wholesaler) commissioned Golder Associates (Germany) to carry out the environmental site assessment of a site in Belgrade, Serbia planned for development of a new Cash&Carry market. InSitu was contracted by Golder to perform the audit combined with limited soil investigation.
    Project site: south Belgrade, Serbia
    Client: Confidential.

    2010: Phase I & Phase II Environmental Assessment of Greenfield Site in Subotica, Serbia;
    Project scope/our task: The Client (global wholesaler) commissioned Golder Associates (Germany) to carry out the environmental site assessment of a site in Subotica, Serbia planned for development of a new Cash&Carry market. InSitu was contracted by Golder to support the audit and to perform soil and groundwater sampling at the site.
    Project site: Subotica, north Serbia (Province of Vojvodina)
    Client: Confidential.

    2008-2009: Environmental Impact Assessment of Shopping Mall Delta Park, Kragujevac
    Keywords: EIA, retail park
    Project area: City of Kragujevac (central Serbia)
    Project Scope: InSitu was commissioned by the Client as a consultant to undertake the full EIA process (including screening, scoping, EIA, public consultation) for the project of development of the retail park. Consent obtained in December 2009.
    Client: “Delta Properties”, Belgrade;
    Authority: Secretariat for Spatial Planning and Environment of the City of Kragujevac

    2008: Phase I Environmental Audit of Greenfield Site in Skopje, FYR of Macedonia;
    Project scope/our task: A real estate client commissioned Golder Associates (UK) to perform the environmental assessment of the greenfield site in Skopje, Macedonia considered for development. InSitu was subcontracted by Golder to perform the assessment.
    Project site: Skopje (FYR of Macedonia)
    Client: Confidential.

    2007-2008: Environmental Impact Assessment of automotive (heavy vehicles) maintenance and repair facility, Belgrade, Serbia
    Keywords: EIA, automotive maintenance
    Project area: Municipality of Surcin (Belgrade, Serbia)
    Project Scope: InSitu was commissioned by the Client as a consultant to undertake the full EIA process (including screening, scoping, EIA, public consultation) for the project of development of the automotive maintenance center. Consent obtained in March 2008.
    Client: “Delta Automoto”, Belgrade;
    Authority: Municipality of Surcin

    2007: Phase I Environmental Assessment of Former Ferrochromium Manufacturing Site, Croatia;
    Project scope/our task: A real estate client commissioned Golder Associates (UK) to perform the environmental assessment of the former industrial site in Dugi Rat, Croatia considered for re-development. InSitu was subcontracted by Golder to perform the assessment.
    Project site: Dugi Rat (Croatia)
    Client: Confidential;

    2007: Phase I Environmental Audit of Greenfield site in Hvar, Croatia;
    Project scope/our task: A real estate client commissioned Golder Associates (UK) to perform the environmental assessment of the greenfield site in Hvar, Croatia considered for development. InSitu was subcontracted by Golder to perform the assessment.
    Project site: Hvar (Croatia)
    Client: Confidential;

    2007: Phase I Environmental Audit of Eleven Real Estate Properties, Serbia;
    Project scope/our task: A global investment bank commissioned Golder Associates (UK) to perform the environmental assessment of eleven sites in the cities of Belgrade and Nis (Serbia) considered for commercial development. InSitu was subcontracted by Golder to perform the assessment.
    Project site: Belgrade and Nis (Serbia)
    Client: Confidential.

    2006: Environmental Baseline Study Kljuc-Rajkovic, Mionica, Serbia
    Keywords: field investigations, baseline assessment
    Project area: villages of Kljuc and Rajkovic (Municipality of Mionica)
    Project scope/our task: The Client was planning to develop the water bottling plant in the village of Kljuc. As a part of the project development, InSitu was commissioned to perform comprehensive baseline assessment of the area. Assessment involved field investigations including ecology assessment, sampling of surface water, groundwater and soil, hydrogeology observations, identification of environmental pressures, etc.
    Client: “Delta M”, Belgrade

  • +

    TOURISM DEVELOPMENT


    2013: Gamzigrad Romuliana Visitor’s Center – Feasibility Study;
    Keywords: cultural heritage, tourism development, infrastructure, environmental and social analysis, feasibility study;
    Project area: Gamzigrad, Municipality of Zajecar (East Serbia)
    Project scope: Development of infrastructure (parking lots, access roads, visitor center) at UNESCO World Heritage site – Gamzigrad Romuliana. Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2011: Revitalization of Golubac Fortress – Feasibility Study;
    Keywords: cultural heritage, tourism development, infrastructure, environmental and social analysis, feasibility study;
    Project area: Municipality of Golubac (East Serbia);
    Project scope: Rehabilitation of medieval fortress in the town of Golubac, including different infrastructure sub-components (road and tunnel construction, pier construction, etc). Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2008-2009: Integrated Tourism Development Infrastructure in the Vlasina Lake Area – Feasibility Study;
    Keywords: nature heritage, tourism development, infrastructure, environmental and social analysis, feasibility study
    Project area: Vlasina Lake, Municipality of Surdulica;
    Project scope: Development of integrated tourism infrastructure in the nature designated area of the Vlasina Lake. The main components of the projects include extension of water supply system, development of wastewater infrastructure for surrounding settlements, solid waste management equipment, improvements and extension of local roads, public tourism infrastructure. Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

  • +

    ENVIRONMENTAL TRAINING


    2012: Training in Environmental Legislation in Municipal Infrastructure projects
    Date and venue: 20-21 September 2012, Fruska Gora (North Serbia, Province of Vojvodina);
    Training Scope: Raising awareness and training on implementation of new environmental regulations in infrastructure projects in local authorities and public utility companies. The training involved areas of waste management, wastewater management, protection of water resources and environmental impact assessment (EIA);
    Participants: provincial and local environmental authorities and PUCs from 19 municipalities of North Serbia.

    2012: Master Class for Infrastructure Project Preparation and Implementation
    Date and venue: 5-6 April 2012, Arandjelovac (Central Serbia);
    Training Scope: Raising awareness and training on preparation and implementation infrastructure projects.
    Our task: Role of environmental and social impact assessment in the project cycle;
    Participants: state authorities (several ministries), members of the MISP Steering Committee.

    2011: Training in Environmental Legislation in Municipal Infrastructure projects
    Date and venue: 9-10 November 2011, Palic (North Serbia, Province of Vojvodina);
    Training Scope: Raising awareness and training on implementation of new environmental regulations in infrastructure projects in local authorities and public utility companies. The training involved areas of waste management, wastewater management, protection of water resources and environmental impact assessment (EIA);
    Participants: provincial and local environmental authorities and PUCs from 10 municipalities of North Serbia.

    2011: Master Class for Infrastructure Project Preparation and Implementation
    Date and venue: 28-29 June 2011, Divcibare (Central Serbia);
    Training Scope: Raising awareness and training on preparation and implementation infrastructure projects.
    Our task: Role of environmental and social impact assessment in the project cycle;
    Participants: state authorities (several ministries), members of the MISP Steering Committee.

    2011: Training in Environmental Legislation in Municipal Infrastructure projects
    Date and venue: 17-18 March 2011, Kucevo (East Serbia);
    Training Scope: Raising awareness and training on implementation of new environmental regulations in infrastructure projects in local authorities and public utility companies. The training involved areas of waste management, wastewater management, protection of water resources and environmental impact assessment (EIA);
    Participants: state environmental authorities, local environmental authorities and PUCs from 14 municipalities of East Serbia.

    2011: Master Class for EU Delegation members
    Date and venue: 24 March 2011, Belgrade;
    Training Scope: Raising awareness and training on preparation and implementation infrastructure projects in Serbia.
    Our task: Role of environmental and social impact assessment in the project cycle;
    Participants: Members of the EU Delegation in Serbia.

    2010: Training in Environmental Legislation in Municipal Infrastructure projects
    Date and venue: 15-16. December 2010, Zlatibor (West Serbia);
    Training Scope: Raising awareness and training on implementation of new environmental regulations in infrastructure projects in local authorities and public utility companies. The training involved areas of waste management, wastewater management, protection of water resources and environmental impact assessment (EIA);
    Participants: local environmental authorities and PUCs from 13 municipalities of Central and West Serbia.

 