    ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA)


    2015-2016: Environmental and Social Scoping Study for Belgrade Waste to Energy Project, Serbia;
    Keywords: Vinča waste landfill, closure of waste dumpsites, environmental and social scoping
    Project area: City of Belgrade;
    Project scope: Part of technical advisory services of the IFC to the City of Belgrade in developing of public-private-partnership through the international tender. The Scoping Study includes development and construction of new waste treatment and disposal facilities, including construction of a new sanitary landfill for residual non-hazardous and inert waste, and rehabilitation of the existing landfill. InSitu was part of the team led by Fichtner (Germany);
    Our task: Environmental Scoping Study;
    Client: International Finance Corporation.

    2015: Cumulative Impact Assessment of 99 MW wind farm “Alibunar A”, Serbia
    Keywords: windfarm, cumulative impact, ESIA
    Project area: Municipality of Alibunar (North Serbia, Province of Vojvodina)
    Project Scope: Following the completion of the ESIA due diligence by the lenders, the preparation of Cumulative Impact Assessment was one of the needed actions. InSitu was subcontracted for this task by Atkins (UK).
    Client: WindVision Operations (Serbia).

    2013-2014: Environmental and Social Impact Assessment of 125 MW wind farm “Kovacica”, Serbia
    Keywords: windfarm, ESIA
    Project area: Municipality of Kovacica (North Serbia, Province of Vojvodina)
    Project Scope: Preparation of environmental and social impact assessment (ESIA) in accordance with IFIs performance standards and local Serbian regulation. InSitu was a local consultant supporting the leading WSP (UK). EIA process successfully completed including the screening, scoping and public consultation procedures. Consent obtained in March 2014.
    Client: Electrawinds (Serbia);
    Authority: Provincial Secretary of Environment, Novi Sad.

    2013: Environmental and Social Impact Assessment of 2.4 MW small hydropower plant “Moravica”, Arilje, Serbia
    Keywords: small hydropower plant, ESIA
    Project area: Municipality of Arilje, River Moravica (Western Serbia);
    Project scope/Our task: Environmental and Social Impact Assessment according to IFC performance standards. Project included investigations at the Moravica River, collection and detailed review of baseline environmental data, preparation of the ESIA Report including Environmental and Social Action Plan, Stakeholder Engagement Plan;
    Client: Enso Hydro (Austria) / Energy Saving Group (Serbia).

    2011-2012: Environmental and Social Impact Assessment of 157 MW windfarm “Cibuk”, Serbia
    Keywords: windfarm, ESIA
    Project area: Municipality of Kovin (North Serbia, Province of Vojvodina)
    Project Scope: Preparation of environmental and social impact assessment (ESIA) in accordance with IFIs performance standards and local Serbian regulation. InSitu was a local consultant supporting the leading WS Atkins (UK). EIA process successfully completed including the screening, scoping and public consultation procedures. Consent obtained in November 2012.
    Client: Continental Wind Partners (Serbia);
    Authority: Provincial Secretary of Environment, Novi Sad.

    2012: 400 kV Overhead Power Line Connecting the Wind Farm Cibuk to the National Grid – EIA Scoping
    Keywords: overhead power line, EIA scoping
    Project area: Municipality of Kovin, Province of Vojvodina (north Serbia)
    Project scope: Preparation of the scoping report as a part of the formal EIA procedure for the proposed 10,7 km-long 400 kV OHL.
    Client: Continental Wind Partners (Serbia);
    Authority: Provincial Secretary of Environment, Novi Sad.

    2011-2012: Environmental Impact Assessment of Flue-gas Desulphurization Plant in 1650 MW Lignite-Fired Thermal Powerplant “Nikola Tesla A”
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade. Project financed by Japan official development assistance (ODA Loan).
    Client (beneficiary): TPP “Nikola Tesla”;
    Authority: Ministry of Environment, Mining and Spatial Planning of Serbia;

    2011: Environmental Impact Assessment of Use of Refuse Derived Fuel (RDF) as a Fuel in “Titan” Cement Plant, Kosjeric, Serbia
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade;
    Client: “Titan” cement plant;
    Authority: Ministry of Environment, Mining and Spatial Planning of Serbia;

    2010: Environmental Impact Assessment of Incineration of Seized Tobacco and Drugs in TPP “Nikola Tesla A”, Obrenovac, Serbia
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade;
    Client: TPP “Nikola Tesla”;
    Authority: Ministry of Environment, Mining and Spatial Planning of Serbia;

    2010: Environmental Impact Assessment of Coal Quality Analyser in TPP “Nikola Tesla B”, Obrenovac, Serbia
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade;
    Client: TPP “Nikola Tesla”;
    Authority: Ministry of Environment, Mining and Spatial Planning of Serbia;

    2008-2009: Environmental Impact Assessment of offset printing complex in Belgrade, Serbia;
    Clients: “Politika”, “Politika Newspapers and Magazines”;
    Authority: Secretariat for environmental protection of the City of Belgrade

    2008-2009: Environmental Impact Assessment of 116 MW Hot-Water Boiler in District Heating Plant “Vozdovac”, Belgrade, Serbia
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade;
    Client: PUC “Beogradske Elektrane” – District Heating Company;
    Authority: Secretariat for Environmental Protection of the City of Belgrade;

    2008-2009 Environmental Impact Assessment of 140 MW hot-water boiler in district heating plant “Novi Beograd”, Belgrade, Serbia
    Project performed in the team with the Faculty for Mechanical Engineering, University of Belgrade;
    Client: PUC “Beogradske Elektrane” – District Heating Company;
    Authority: Secretariat for Environmental Protection of the City of Belgrade;

    2008-2009: Environmental Impact Assessment of Flue-Gas Desulfurization Plant in TPP “Kostolac B”, Serbia
    Project performed in the team of the Faculty for Mechanical Engineering, University of Belgrade (Serbia) in consortium with Faculty of Mining and Geology (Belgrade, Serbia), Worley Parsons (USA), Energoprojekt Entel (Belgrade, Serbia)
    Client: TPP „Kostolac“;
    Authority: Ministry for Spatial Planning and Environmental protection, Republic of Serbia;

    2008-2009: Environmental Impact Assessment of shopping center, Kragujevac, Serbia;
    Client: “Delta Properties”, Belgrade;
    Authority: Secretariat for spatial planning and environment of the city of Kragujevac

    2007-2008: Environmental Impact Assessment of automotive (heavy vehicles) maintenance and repair facility, Belgrade,Serbia;
    Client: “Delta Automoto”, Belgrade;
    Authority: Municipality of Surcin

    2007-2009: Environmental Impact Assessment of mineral water bottling facility, Mionica, Serbia; Client: “Mioni” d.o.o., Belgrade;
    Authority: Municipality of Mionica

    2007-2008: Environmental Impact Assessment of poultry slaughtering facility, Boljevci, Serbia;
    Client: “Piljan Komerc”, Boljevci;
    Authority: Municipality of Surcin

    2007-2008 : Environmental Impact Assessment of poultry farm, Serbia;
    Client: “Piljan Komerc”, Boljevci;
    Authority: Municipality of Surcin

  • +

    PLANNING AND PERMITTING - Environmental and Social Analysis


    2016-2017: Feasibility Study, design and tender documentation of an integrated waste management system in East and Northeast Region of FYR Macedonia (EuropeAid/136070/IH/SER/MK).
    Keywords: waste management, feasibility study;
    Project scope: Preparation of the project studies (FS, CBA, EIA), design and tender documentation for the project. Performed by the consortium Eptisa (Spain), Epem (Greece).
    Our task: Environmental and Social Analysis as part of Feasibility Study, Environmental and Social Impact Assessment compliant to the EU Directive, Environmental Impact Assessment compliant to the national legislation.

    2015-2016: Wastewater collection and Treatment Project for the City of Niš (Serbia) – Feasibility Study;
    Keywords: sanitary and industrial wastewater, environmental and social analysis, feasibility study;
    Project area: City of Niš;
    Our task: environmental and social analysis of the proposed wastewater collection and treatment (250,000 PE);
    The Study has been prepared by IMG on behalf of the Swedish International Development Cooperation Agency (SIDA) as part of the Environmental Infrastructure Support Programme (EISP), implemented by the International Management Group (IMG).
    Beneficiaries: Ministry of Agriculture and Environmental Protection, City of Niš.

    2015-2016: Reconstruction and modernization of the existing railway track and construction of a second track on the line Belgrade – Niš, Section Stalać – Djunis (Serbia); Infrastructure Projects Facility in the Western Balkans; WB8-SER-TRA-14; EuropeAid/131160/C/SER/MULTI/3C – funded by European Commision Delegation;
    Keywords: railway, feasibility study, environmental and social impact assessment
    Project Scope: Feasibility Study of modernization of the 17 km-long railway line. Project performed by the consortium led by Mott MacDonald (UK). InSitu was part of the team lead by Atkins (UK).
    Our task: (1) Environmental and Social Impact Assessment of the project according to the EBRD Performance Requirements, (2) Environmental Impact Assessment according to the national requirements;
    Beneficiary: PE „Serbian Railways“

    2014: Feasibility Study – Sabac district heating upgrade, Serbia;
    Keywords: biomass, district heating, feasibility study
    Project area: City of Sabac (North-East Serbia)
    Project scope: Installation of new biomass boiler and improvement of the heating network. Realized by Fichtner (Germany) and Energy Saving Group (Serbia). InSitu was subcontracted.
    Our Task: Environmental and Social Analysis of the project; Environmental and Social Action Plan; Evaluation of compliance with the EBRD performance requirements; Stakeholder Engagement Plan.
    Project financed by European Bank for Reconstruction and Development;
    Project beneficiary: City of Sabac, District Heating Company „Toplana Sabac“.

    2014: Municipality of Apatin Industrial Zone – Feasibility Study;
    Keywords: infrastructure, logistic center, environmental and social analysis, feasibility study;
    Project area: Municipality of Apatin;
    Project scope: Development of the logistic zone;
    Our task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2010 Programme.

    2014: The City of Zrenjanin Waste Water Management Project – Feasibility Study;
    Keywords: wastewater treatment plant, environmental and social analysis, feasibility study
    Project area: City of Zrenjanin, Serbia (Vojvodina Province)
    Project scope: Construction of wastewater treatment plant for industrial and communal wastewater of the city of Zrenjanin (~100,000 PE). Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2010 Programme.

    2013: Protection of Lake Bovan Catchment Area – Feasibility Study;
    Keywords: wastewater and sanitation, environmental and social analysis, feasibility study, tourism development
    Project area: Town of Sokobanja, East Serbia
    The project scope: Integrated development and improvement of water supply and wastewater collection/sewerage systems and the construction of a wastewater treatment plant (16,000 PE) in the city of Sokobanja. Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2010 Programme.

    2013: Zrenjanin Regional Waste Management System – Feasibility Study;
    Keywords: regional waste landfill, closure of waste dumpsites, environmental and social analysis, feasibility study
    Project area: Municipalities of Zrenjanin, Titel, Kovacica, Secanj, Zitiste (north-east of Serbia, Province of Vojvodina)
    Project scope: Development of the regional waste management scheme in five municipalities (approx. 200,000 inhabitants) including construction of the regional landfill centre and closure of the existing dump sites. Feasibility study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Groundwater pollution analysis at the landfill site, environmental and social impact analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2010 Programme.

    2013: Free Zone South Logistics Center Nis – Feasibility Study;
    Keywords: infrastructure, logistic center, environmental and social analysis, feasibility study Project area: The City of Nis (South Serbia);
    Project scope: Development of the logistic zone (for efficient truck transport of goods) in the outskirts of the city of Nis, in order to extend the activities of the current industrial zone. Project scope included development of site infrastructure (access roads, water and sanitation, electricity, telecommunication, drainage, parking lots, office space). Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2010 Programme.

    2012: Promotion of Renewable Energy Sources and Energy Efficiency (EuropeAid/129768/C/SER/RS) – Component A and Component B;
    Keywords: biomass, environmental and social analysis, pre-feasibility study
    Project area: Krusevac (Central Serbia), Pancevo, Ruma (north Serbia, Province of Vojvodina)
    Project scope: Build the capacity in the energy sector which will lead to the increased use of geothermal energy and increased participation of high efficient CHP facilities in electricity generation and heat production. The project was performed by EPTISA (Spain) in association with Mannvit (Iceland) and Energy Saving Group (Serbia). After initial screening, three sites were selected for development of geothermal energy facilities and three sites were selected for development of CHP facilities. Six pre-feasibility studies were produced.
    Our task: For the purpose of the pre-feasibility studies InSitu performed the environmental and social assessment of the project
    Project financed by the European Union Delegation to Serbia under the IPA2008 Programme.
    Beneficiary: Ministry of Infrastructure and Energy.

    2014: Pomoravlje improvement of water and wastewater management – Feasibility Study;
    Keywords: water supply, communal and industrial wastewater, environmental and social analysis, feasibility study;
    Project area: Municipalities of Paracin, Cuprija, Despotovac, Svilajnac, Rekovac (Central Serbia);
    Project in progress;
    Our task: environmental and social analysis;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2013: Gamzigrad Romuliana Visitor’s Center – Feasibility Study;
    Keywords: cultural heritage, tourism development, infrastructure, environmental and social analysis, feasibility study;
    Project area: Gamzigrad, Municipality of Zajecar (East Serbia)
    Project scope: Development of infrastructure (parking lots, access roads, visitor center) at UNESCO World Heritage site – Gamzigrad Romuliana. Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2013: Cacak Wastewater Treatment Plant – Feasibility Study;
    Keywords: wastewater collection and treatment, communal and industrial wastewater, environmental and social analysis, feasibility study
    Project area: City of Cacak, Central Serbia
    Project scope: Improvement of wastewater collection and installation of the wastewater treatment plant (96,000 PE) in the city of Cacak. Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Environmental and social analysis;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2011 – 2012: Regional solid waste management scheme at Pirot District – Preparation of Master Plan for closure of the existing landfills;
    Keywords: field investigations, risk assessment, closure plan
    Project area: Municipalities of Pirot, Dimitrovgrad, Babusnica, Bela Palanka (South-East Serbia);
    Project scope: Closure of the existing municipal dumpsites in four municipalities. Based on the risk assessment and results of performed investigation the cost-efficient measures for landfill closure were proposed. Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental baseline analysis, preparation of risk assessment, management of field investigation and evaluation of results, proposal of the closure plan;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2011 – 2012: Raska Water Management – Feasibility Study;
    Keywords: wastewater collection and treatment, communal wastewater, tourism development, environmental and social analysis, feasibility study
    Project area: Municipality of Raska, National Park Kopaonik (South Serbia)
    Project scope: Replacement of the pressure main, extension and rehabilitation of sewer network, construction of the main collector, construction of the waste water treatment plant (WWTP ~15-18,000 PE) in the municipality of Raska including the touristic center Kopaonik. Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Environmental and social analysis
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2011: Vladicin Han Regional Industrial Zone South – Feasibility Study;
    Keywords: infrastructure, industrial zone, environmental and social analysis, feasibility study;
    Project area: Town of Vladicin Han (South-East Serbia);
    Project scope: Infrastructure development (roads, sewage, water supply, electricity, communications) for the future industrial zone “South” in the town of Vladicin Han. Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our Task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2011: Revitalization of Golubac Fortress – Feasibility Study;
    Keywords: cultural heritage, tourism development, infrastructure, environmental and social analysis, feasibility study;
    Project area: Municipality of Golubac (East Serbia);
    Project scope: Rehabilitation of medieval fortress in the town of Golubac, including different infrastructure sub-components (road and tunnel construction, pier construction, etc). Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2010 – 2011: Environmental Protection Plan of the Celije water reservoir;

    2010: Wastewater Treatment Plant in Novi Pazar – Feasibility Study;
    Keywords: wastewater collection and treatment, communal and industrial wastewater, environmental and social analysis, feasibility study
    Project area: Municipality of Novi Pazar (South Serbia)
    The project scope: Rehabilitation and extension of the sanitary and storm sewerage, construction of the main wastewater collector, and construction of the 120,000 PE wastewater treatment plant and sludge treatment installation for the town of Novi Pazar. Feasibility study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Environmental and social analysis;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2009-2010: Modernisation of the railway line Trupale (Nis)-Presevo-border of the Former Yugoslav Republic of Macedonia; Infrastructure Projects Facility in the Western Balkans; TA-SER-15; EuropeAid/124605/C/SERMULTI – funded by European Commision Delegation;
    Keywords: railway, pre-feasibility study, environmental and social analysis
    Project Scope: Pre-Feasibility Study of modernization of the 167 km-long railway line. Project performed by the consortium led by WYG International (UK). InSitu was part of the team lead by Faculty of Transport and Traffic Engineering University of Belgrade
    Our task: (1) Evaluation of environmental and socio-economic effects of each project option; (2) Effects of Modernization and Environmental and Social Impact Analysis;
    Beneficiary: PE „Serbian Railways“.

    2008-2009: South – West Backa – Regional Water Supply – Feasibility Study;
    Keywords: regional water supply, preliminary hydrogeological investigations, groundwater resources overview, environmental and social analysis
    Project area: Region of West Backa, municipalities of Backa Palanka, Bac, Odzaci and Kula (Serbia, Province of Vojvodina)
    The project scope: Construction of regional water supply scheme including opening of new groundwater sources (well fields) in the Danube River alluvial formations. Feasibility study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Detailed analysis of the existing sources, preliminary investigations of the potential new sources along the Danube River, environmental assessment of the proposed project.
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2008-2009 : Kolubara Regional Water Supply Scheme – Feasibility Study;
    Keywords: regional water supply, groundwater resources overview, environmental and social analysis
    Project area: Kolubara region – Municipalities of Valjevo, Lazarevac, Mionica, Ub, Lajkovac (West Serbia)
    The project scope: Improvement of regional water supply scheme including installation of raw water system from the accumulation Rovni, construction of several drinking water treatment plants, installation of transmission system. Feasibility study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Overview and analysis of groundwater resources in the region and preparation of the environmental and social analysis of the project.
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2008-2009: Integrated Tourism Development Infrastructure in the Vlasina Lake Area – Feasibility Study;
    Keywords: nature heritage, tourism development, infrastructure, environmental and social analysis, feasibility study
    Project area: Vlasina Lake, Municipality of Surdulica;
    Project scope: Development of integrated tourism infrastructure in the nature designated area of the Vlasina Lake. The main components of the projects include extension of water supply system, development of wastewater infrastructure for surrounding settlements, solid waste management equipment, improvements and extension of local roads, public tourism infrastructure. Project performed as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG;
    Our task: Environmental and social analysis of the project;
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.
    2008-2009: Pcinja District – Intermunicipal Water Supply Project – Feasibility Study;
    Keywords: regional water supply, environmental and social analysis, groundwater resources overview
    Project area: Pcinja District – Municipalities of Vranje, Bujanovac and Presevo (South Serbia)
    Project scope: Development of regional water supply scheme using raw water from Prvonek water reservoir near Vranje. Project included installation of raw water transmission line, construction of several drinking water treatment plants, improvement of the existing systems in municipalities. Feasibility Study prepared as a part of the MISP program (Municipal Infrastructure Support Programme) which assists municipalities in Serbia in the preparation of project documentation and implementation of municipal infrastructure projects. The project is performed by consortium Eptisa Group, Royal Haskoning and VNG.
    Our task: Overview and analysis of groundwater resources in the region and preparation of the environmental and social analysis of the project.
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA2008 Programme.

    2008-2009: Renewable energy feasibility studies (EuropeAid/126034/D/SER/YU)
    Keywords: small hydropower plants, feasibility study, environmental analysis
    Project scope: Project financed by EUD performed by consortium Eptisa/Socoin/NIP included preparation of Feasibility Study for 38 sites in Serbia predicted for installation of small hydropower plants;
    Our Task: As local experts in the project team we were responsible for environmental legislation review, environmental screening, baseline environmental assessment at the HPP sites, identification of significant environmental impacts in relation to HPP construction and operations, proposing the environmental mitigation measures, monitoring;
    Project funded by the European Union Delegation in Serbia;
    Beneficiary: Ministry of Energy and Mining of Serbia.

    2007-2008: Feasibility Study of road “Novi Sad-Sabac-Loznica-Pozega”; Europe Aid/117702/D/SV/YU; performed by consortium Eptisa Group and IRD.
    Keywords: road, feasibility study, environmental and social impact assessment
    Project Scope: Rehabilitation of the road M21 from Novi Sad to Pozega via Sabac (North and West Serbia).
    Our task: environmental and social impact assessment
    Beneficiary: PE „Roads of Serbia“
    Project funded by European Agency for Reconstruction.

    2007: Regional oil products pipeline through Serbia – Pre-feasibility study;
    Keywords: regional oil product pipeline, preliminary EIA
    Pipeline route: Sombor-Novi Sad-Pancevo-Smederevo-Jagodina-Nis
    Project scope: Preparation of the pre-feasibility study and general design of the proposed regional oil products pipeline (402 km) through Serbia.
    Our task: Preliminary environmental impact analysis of the project
    InSitu was subcontracted by “Energoprojekt Industrija”, Belgrade;
    Client: “Transnafta”, Pancevo.

  • +

    ENVIRONMENTAL DUE DILIGENCE / ENVIRONMENTAL SITE ASSESSMENT


    2017: Environmental and social due diligence audit of two road sections of Trans-European Corridor Vc: the Johovac – Rudanka section (6 km) and the Johovac – Podnovlje (14 km) in Republika Srpska, Bosnia and Herzegovina;
    Keywords: motorway, environmental and social due diligence audit
    Project Scope: Environmental and social due diligence audit of the project. InSitu was subcontracted as a local consultant by Zylwood Consulting (UK).
    Our task: Local support in environmental and social due diligence work;
    Client: European Bank for Reconstruction and Development, European Investment Bank.

    2017: Phase I Environmental Health and Safety Due Diligence Audit of metal rollers production site, Federation of Bosnia and Herzegovina (BiH)
    Project scope/our task: EHSDD for buy-side. InSitu was subcontracted by Enacon (Czech Republic) to perform the audit;
    Project area: northern Herzegovina;
    Client: ERM (Germany).

    2017: Desktop Environmental Health and Safety Assessment of float glass production, Croatia
    Project scope/our task: Assessment for sell-side. InSitu was subcontracted by Enacon (Czech Republic) to perform the audit;
    Project area: western Slavonia;
    Client: ERM (UK).

    2015: Environmental and social due diligence audit of two key road sections of Trans-European Corridor Vc: the Pocitelj – Buna section (7 km) and the Donja Gracanica – Zenica North (2 km), Bosnia and Herzegovina;
    Keywords: motorway, environmental and social due diligence audit
    Project Scope: Environmental and social due diligence audit of the project. InSitu was subcontracted by Atkins (UK).
    Our task: Environmental Due Diligence of current operations, preparation of Environmental and Social Action Plan, and evaluation of the project’ compliance with the EBRD performance requirements;
    Client: European Bank for Reconstruction and Development.

    2015: Environmental Assessment and Health and Safety Audit of Magna Seating d.o.o., Odzaci, Serbia
    Project scope/our task: Environmental assessment and HS audit of factory for manufacturing of covers for cars and vehicles. InSitu was subcontracted by Ramboll Environ (Germany) to perform the audit;
    Project area: Town of Odzaci (north-west Serbia, Province of Vojvodina);
    Client: Magna Europe (global automotive supplier).

    2014: Environmental and Social Due Diligence of Sabac district heating plant, Serbia;
    Keywords: biomass, district heating, environmental and social due diligence
    Project scope: Installation of new biomass boiler and improvement of the heating network. Realized by Fichtner (Germany) and Energy Saving Group (Serbia). InSitu was subcontracted.
    Our Task: Environmental and Social Due Diligence of the district heating company;
    Project financed by European Bank for Reconstruction and Development;
    Project beneficiary: City of Sabac, District Heating Company „Toplana Sabac“.

    2014: Phase I Environmental Site Assessment and Compliance Audit of Magna Seating d.o.o., Odzaci, Serbia
    Project scope/our task: Phase I ESA and compliance audit of factory for manufacturing of covers for cars and vehicles. InSitu was subcontracted by Environ (Germany) to perform the audit.
    Project area: Town of Odzaci (north-west Serbia, Province of Vojvodina)
    Client: Magna Europe (global automotive supplier).

    2012: Environmental Due Diligence of “Rudnik Kovin” mine, Serbia
    Project scope/our task: The Client was considering the opportunity for acquisition of the (underwater river) coal mine and was evaluating the risks of the potential investment. InSitu performed limited environmental due diligence in order to evaluate the site’ environmental legal compliance.
    Project site: Kovin Mine (north Serbia, Province of Vojvodina)
    Client: confidential.

    2012: Environmental Site Assessment and Limited Groundwater Investigation at the Site in Nis, Serbia
    Project scope/our task: InSitu was commissioned by a global automotive manufacturer to perform the environmental assessment of the site in Nis considered for acquisition. Service included Phase I ESA and installation of monitoring well, groundwater sampling and analysis in order to evaluate potential historical contamination.
    Project site: Nis (south Serbia)
    Client: Confidential.

    2011: Environmental and Social Due Diligence of “Selova” and “Rovni” small hydro-power plants
    Keywords: small hydropower plants, due dilligence, EBRD
    Project area: Selova dam (Kursumlija, south Serbia) and Rovni dam (Valjevo, west Serbia);
    Project scope: Electric Power Industry of Serbia (EPS) has approached EBRD for financing of construction of two small hydro-power plants at “Selova” and “Rovni” dams. The Bank engaged WS Atkins (UK) as a lead Consultant to undertake environmental and social due diligence of the project in accordance with EBRD performance requirements;
    Our task: InSitu was involved as a local environmental and social consultant. Our tasks included local legislation expertise, baseline assessment, gap analysis, stakeholder engagement plan.
    Client: European Bank for Reconstruction and Development.

    2010: Phase I Environmental Assessment and Limited Phase II Assessment at the Greenfield Site in Belgrade, Serbia;
    Project scope/our task: The Client (global wholesaler) commissioned Golder Associates (Germany) to carry out the environmental site assessment of a site in Belgrade, Serbia planned for development of a new Cash&Carry market. InSitu was contracted by Golder to perform the audit combined with limited soil investigation.
    Project site: south Belgrade, Serbia
    Client: Confidential.

    2010: Environmental Audit of “Lafarge” Cement Plant and Associated Quarries in Beocin, Serbia
    Project scope/our task: The cement producer Lafarge commissioned Atkins (UK) to conduct the global internal environmental audit following the Lafarge audit protocol. InSitu was subcontracted by Atkins to support the audit of the site in Serbia.
    Project site: Beocin cement plant (north Serbia, Province of Vojvodina)
    Client: Lafarge ETC.

    2010: Phase I Environmental Assessment of Heavy Vehicle Repair and Maintenance Site in Sarajevo, Bosnia and Herzegovina;
    Project scope/our task: InSitu was commissioned by a global automotive manufacturer to perform the Phase I ESA of the site in Sarajevo considered for acquisition.
    Project site: Sarajevo (Bosnia and Herzegovina)
    Client: Confidential.

    2010: Phase I & Phase II Environmental Assessment of Greenfield Site in Subotica, Serbia;
    Project scope/our task: The Client (global wholesaler) commissioned Golder Associates (Germany) to carry out the environmental site assessment of a site in Subotica, Serbia planned for development of a new Cash&Carry market. InSitu was contracted by Golder to support the audit and to perform soil and groundwater sampling at the site.
    Project site: Subotica, north Serbia (Province of Vojvodina)
    Client: Confidential.

    2010: Environmental Audit of TPP “Kolubara A”, TPP “Kostolac B” and Lignite Open Mine “Tamnava West”, Serbia;
    Project scope/our task: EBRD provided the loan to Electric Power Industry of Serbia (EPS) for three projects in Serbia. Following the EBRD project monitoring procedure, the Bank commissioned Environ (UK) to conduct the audit of implementation of actions specified in the Environmental Action Plans and loan agreement documentation. InSitu was subcontracted by Environ as a local consultant.
    Project sites: Central Serbia
    Client: EBRD.

    2009: Phase I Environmental Assessment of a Heavy Vehicle Repair and Maintenance Site, Belgrade, Serbia;
    Project scope/our task: InSitu was commissioned by a global automotive manufacturer to perform the Phase I ESA of the site in Belgrade considered for acquisition.
    Project site: Belgrade (Serbia)
    Client: Confidential.

    2008: Phase I Environmental Assessment of Three Sites of Carbon-Steel Product Manufacturing and Retail, Serbia;
    Project scope/our task: InSitu was commissioned by a global steel manufacturer to perform the Phase I ESA of three sites (production and retail) in Belgrade, considered for acquisition.
    Project site: Belgrade (Serbia)
    Client confidential.

    2008: Phase I Environmental Assessment of Coatings Manufacturing Plants in Serbia and FYR of Macedonia;
    Project scope/our task: A global paints and coatings manufacturer commissioned Environ (Poland) to conduct the Phase I ESA (including health and safety) of paints manufacturing sites in Serbia and Macedonia considered for acquisition. InSitu was subcontracted by Environ to perform the assessment.
    Project site: Sabac (Serbia) and Skopje (FYR of Macedonia)
    Client confidential.

    2008: Phase I Environmental Audit of Greenfield Site in Skopje, FYR of Macedonia;
    Project scope/our task: A real estate client commissioned Golder Associates (UK) to perform the environmental assessment of the greenfield site in Skopje, Macedonia considered for development. InSitu was subcontracted by Golder to perform the assessment.
    Project site: Skopje (FYR of Macedonia)
    Client: Confidential.

    2007: Environmental Due Diligence of Major Agricultural Manufacturer in Serbia;
    Project scope/our task: Raiffeisen Investment AG was selected as a privatization advisor of the Agency of Privatisation of Republic of Serbia in the project of privatization of PKB Corporation – the largest agricultural company in Serbia. InSitu was commissioned by Raiffeisen to perform the environmental and health and safety due diligence of the company in accordance with the World Bank standards (who funded the privatization process). PKB production involves cattle breeding, farming and dairy production.
    Project site: Belgrade (Serbia);
    Client: Agency of Privatisation of Republic of Serbia.

    2007: Phase I Environmental Assessment of Former Ferrochromium Manufacturing Site, Croatia;
    Project scope/our task: A real estate client commissioned Golder Associates (UK) to perform the environmental assessment of the former industrial site in Dugi Rat, Croatia considered for re-development. InSitu was subcontracted by Golder to perform the assessment.
    Project site: Dugi Rat (Croatia)
    Client: Confidential;

    2007: Phase I Environmental Audit of Greenfield site in Hvar, Croatia;
    Project scope/our task: A real estate client commissioned Golder Associates (UK) to perform the environmental assessment of the greenfield site in Hvar, Croatia considered for development. InSitu was subcontracted by Golder to perform the assessment.
    Project site: Hvar (Croatia)
    Client: Confidential;

    2007: Phase I Environmental Audit of Eleven Real Estate Properties, Serbia;
    Project scope/our task: A global investment bank commissioned Golder Associates (UK) to perform the environmental assessment of eleven sites in the cities of Belgrade and Nis (Serbia) considered for commercial development. InSitu was subcontracted by Golder to perform the assessment.
    Project site: Belgrade and Nis (Serbia)
    Client: Confidential.

  • +

    SITE INVESTIGATIONS


    2012: Field Investigation for the purpose of Master Plan for closure of the existing landfills in the Pirot region;
    Keywords: field investigations, environmental media sampling and analysis
    Project area: Municipalities of Pirot, Dimitrovgrad, Babusnica, Bela Palanka (South-East Serbia)
    Project scope: Preparation of the Master Plan for closure of the existing landfills in four municipalities;
    Our task: Management of investigation works on dumpsites including installation of monitoring wells, soil and groundwater sampling and analysis, surface water and river sediment sampling and analysis, topographic measurements.
    Project funded and managed by the European Union Delegation to Serbia financed under the IPA 2008 Programme.

    2010 – 2011: Design and Installation of Groundwater Monitoring Network in “Holcim” Cement Plant, Novi Popovac, Serbia;
    Keywords: monitoring wells network, groundwater sampling and analysis
    Project scope: InSitu was commissioned by Holcim to establish the groundwater monitoring at the cement plant site in Novi Popovac and at the adjacent abandoned industrial landfill. The scope of work included installation of 14 monitoring wells at the plant site, sampling and analysis of 30 wells, evaluation of the results, preparation of conceptual hydrogeological model, etc.
    Client/ Project site: Holcim Cement Plant, Novi Popovac (Serbia)

 

InSitu d.o.o.
Ledi Pedzet 3
11000 Belgrade
Serbia

e-mail: office [at] insitu.co.rs

Registration No: 20190167

Back to Top